Correcting Soft-Ground Settlement Under Heavy Use: Secondary School Basketball Court Upgrade
Minor settlement and post-rain pooling on soft marine-deposit ground, resolved with a suspended modular floor: quick to lay, and noticeably grippier underfoot.
Key figures
- Area
- approx. 1,400 m²
- Courts
- 2 standard outdoor courts
- Sport
- basketball (secondary-school PE)
- Thickness
- 16 mm
- Programme
- around three weeks incl. base prep and curing
The campus asphalt had been down for many years. Slight movement in the soft subgrade left standing water after rain, and hairline cracks began to bleed bitumen in summer heat. With a packed PE timetable, the rebuild had to fit a single summer window — without disturbing the existing base course or the drainage runs beneath it.
The court was built with a 16 mm double-layer modular tile. A dense array of cylindrical feet under each panel spreads point loads, so slight subgrade movement no longer telegraphs through to the surface. The top face carries a two-way micro-texture and 8 mm through-drainage holes, while self-locking elastic clips take thermal movement into the joint instead of levering it up. Work was confined to levelling and local patching of the existing base: no excavation, no change to the drainage falls.
Approx. 1,400 m² went down in around three weeks including base preparation and curing, with no wet trades and no sanding dust on site. The court is back in use 15 minutes after rain, and ball rebound performs consistently (figure pending test report).
To be confirmed
- Ball rebound figure pending test report
- Base-level survey records and clip pull-out report numbers to be confirmed
- Site visit through the school with one week's notice
The change you notice is how fast it dries. When term starts the students walk straight on — nobody is pushing water off by hand any more.
Project details anonymised at the client's request.